The Six Things to Put in an Aerial Platform Enquiry (and Why "Best Price" Gets You a Worse Quote)

Six lines that turn a catalogue reply into a comparable quote — and the five checks that stop a cheap quote misleading you.

A green truck-mounted aerial work platform standing complete in an empty industrial yard, with a warehouse and steel fence behind
A message that says "please send your best price and catalogue for aerial work platform" gets an answer, but not a useful one. It gets the supplier's cheapest configuration at whatever height is in stock, quoted against a specification nobody verified.
Six lines of information fix that, and they cost you ten minutes.

1. The height, stated as working height or platform height

Say which one you mean. "I need to touch 22 m" and "I need to stand at 22 m" are different machines, two metres apart, and the price gap between them is the price of a boom section.
If you do not know which you need, state the task instead: "change lamps on 12 m poles", "reach the third floor slab at 18 m". A supplier can convert that; they cannot convert a number with an unstated basis.

2. The outreach at that height

This is the item most enquiries omit, and it is the one that decides whether the machine works at all. A boom reaches its rated height with the boom vertical. Reach sideways and the height drops — on our 30 m telescopic unit, the working height at 14 m outreach is 5 m.
Give the horizontal distance from where the vehicle can legally park to the point you must reach, and say what is in between: a parapet, a cable, a kerb, a roof edge.

3. The basket load you need

People plus tools. Most of our units are rated 200 kg, which covers two technicians with equipment; several models — the 45 m among them — are offered in 100 kg, 200 kg and 250 kg variants. The rating is not a formality — it is what the machine is engineered and documented for.

4. Destination and the emission stage your fuel allows

Country, port, and the sulphur content of the diesel you actually buy. Our range includes Euro 3, Euro 5 and China VI builds, and the right one depends on where the machine will run, not on what is newest. Getting this wrong at order stage means the machine and the customs documents disagree later.
Also say whether the unit must be registered as a road vehicle in your market. That changes the chassis, the documentation and sometimes the model.

5. Quantity and the drive side

One unit or five changes the commercial answer and the schedule. Left-hand drive is standard; right-hand drive can be quoted on request and affects the chassis order, so it belongs in the first message rather than the last.

6. Site constraints

The narrowest street on the route, the usable width for outriggers, overhead clearance, and the surface. A machine with a 5,400 mm spread cannot be used on a street that offers 5 m, whatever the height requirement says.

What a good reply looks like

A quote worth comparing states, for each model:
- working height and platform height, plus the working height at your required outreach; - basket rated load; - chassis, wheelbase, gross weight and overall dimensions; - emission stage; - outrigger spread; - what is included — basket, outrigger pads, manuals, spares; - what is explicitly excluded.
If one quote gives a single height figure and a price, and another gives the full set, they are not comparable, and the cheaper one is usually the one with the missing detail.

How to compare two quotes without being misled

1. Same height basis. Convert both to working height before comparing. 2. Same outreach. Ask both for the working height at your actual outreach. 3. Same basket rating. A 100 kg basket is cheaper and may be unusable for your crew. 4. Same chassis class. Wheelbase and gross weight decide road access and licence. 5. Same scope. Pads, manuals, spare parts and training material are frequently the difference.

The one thing we will not do

We will not quote a delivery date or a warranty term that the factory has not confirmed for your configuration. Where a figure is not confirmed at the time of quotation, the quotation says so rather than showing an optimistic number that later becomes a dispute. That is the same reason this site does not print lead times in articles: they belong on the quotation, against a specific build.

Send this, get a usable answer

Height (and which basis) · outreach at that height · basket load · destination, port and fuel/emission · quantity and drive side · site constraints. Six lines.
Start from the range here: aerial work platforms for export, or read how to choose by job rather than height first if the height is still open.

Related reading

Buying advice

Ask us before you commit to a supplier.

Send your destination country, the capacity you need and the job it has to do. We will tell you what fits — and what to watch out for in the quotation.

WhatsApp — fastest reply

+86 158 0912 4321

Send a message any time. Anything received outside working hours (GMT+8) is answered the next working morning.

Email — specifications and documents

[email protected]

For drawings, quotations, shipping documents and technical questions.

Read next

More from the journal

Keep readers moving through related announcements, stories, and field notes.